Custom Battery Cold Plate RFQ for Energy Storage: What to Send and What to Expect

Views: 1     Author: Site Editor     Publish Time: 2026-11-13      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

A custom battery cold plate RFQ that only names a cabinet capacity can bring two quotes 30% apart, with neither price wrong. One assumed a stamped aluminium plate; the other priced a friction stir welded assembly with a manifold, leak testing and a pre-assembled connector set. The gap was created before the RFQ was written. This guide lists what to send so the quotes are comparable, and what to expect back before you commit to a purchase order.

1. Why Most Cold Plate RFQs Cannot Be Compared

An RFQ is a specification in disguise. If it omits the heat load at each C-rate, the coolant inlet temperature or the pressure drop budget, the supplier must choose assumptions - and every supplier chooses different ones. The resulting numbers compare their assumptions, not their manufacturing.

Start from the project brief rather than the part name. If the cooling route and the acceptance criteria are not fixed yet, the specification-first sequence sets that sequence out. Then treat the RFQ as the document that turns those decisions into a request every bidder answers in the same format.

2. The Input Pack: What to Send

The fields below are the minimum an engineer needs to quote accurately. Send them as drawings and tables, not prose, and state which are fixed and which are open to proposal. Our range of cold plate constructions covers several constructions, so the input pack also decides which one is quoted.

image.png

What to send

Why it changes the quote

If it is missing

Pack layout, cell format and plate envelope

Sets plate size, port position and manifold routing

Supplier assumes a standard plate that may not fit

Heat load at each charge and discharge rate

Sets channel design and flow requirement

Quoted capacity is a guess at one benign point

Coolant type, inlet temperature and flow range

Decides material compatibility and pump sizing

Pressure drop and auxiliary power are unverifiable

Allowable pressure drop and pump budget

Constrains channel length and cross-section

A thermally adequate plate may exceed the pump curve

Mounting and sealing interface

Defines flatness, fixing points and connector type

Rework appears at assembly, after the order

Target ΔT and sensor positions

Turns temperature spread into an acceptance line

No basis for rejecting a batch

Annual volume and delivery schedule

Decides tooling, process and unit price

Quoted price assumes a different production scale

Site conditions and corrosion class

Sets coatings, sealing and salt spray requirements

Field failures are excluded from the quote

 

3. Turn Project Limits Into Specification Lines

On a 200 kW+ power-electronics thermal programme, the enclosure could not grow but the power rose 30%, with a C5 corrosion class and a 10% weight limit; measured thermal performance still improved 25% after the fin and joining route were reworked. That result did not come from a bigger heatsink - it came from writing the fixed constraints into the request so the supplier could propose a manufacturable alternative.

Do the same for a custom battery cold plate. State what cannot change (envelope, port positions, weight, corrosion class, annual volume) separately from what the supplier may propose (alloy, joining route, channel geometry). When everything is "flexible", the quote optimises for the supplier's standard process rather than your project.

4. Define the Thermal and Mechanical Envelope

Thermal lines should name the duty cycle, the maximum cell temperature and the cell-to-cell ΔT at that duty cycle. Most BESS designs work inside 15-35°C; around 5°C is a common ΔT ceiling, with 2-3°C a tighter target for premium liquid-cooled systems. Name the coolant inlet temperature and ambient condition at which those numbers must hold, and the sensor count and positions used to verify them.

Mechanical lines should cover plate thickness and flatness, port type and position, sealing method, allowable pressure drop at rated flow, and the leak test method and acceptance pressure. Add channel cleanliness and any site-specific corrosion or ingress class. These are the lines a supplier will be held to at the end of the production line, so they belong in the RFQ rather than in a later email.

5. Define Manufacturing and Quality Requirements

Ask bidders to state the alloy and joining route they propose for your plate size and why. Friction stir welding gives a strong, low-distortion joint for large-format plates; vacuum brazing suits fine internal channels and mixed metal stacks. Request the inspection method for the joint, plus helium or pressure-decay leak testing, flow resistance measurement, dimensional inspection and channel cleanliness records tied to each production batch. A plate construction guide goes deeper on matching construction to application.

Be explicit about traceability. Ask how long records are retained, what triggers re-qualification after a tooling or alloy change, and who signs it off. A quote built on prototype data is not a production quote.

6. State the Commercial Inputs

Expected annual volume, target unit price band, packaging, delivery schedule and incoterms all change the number. State who owns the tooling and what happens to it if the programme ends. Ask for the sample lead time, the first-article approval step and the validation plan as dated commitments, not as "to be discussed". If the plate is to arrive pre-assembled with pipes and connectors, say so - integration work is a cost line and a leak-risk boundary that must be priced.

7. What a Good Quote Should Contain

A usable reply separates tooling, material, joining, testing, packaging, sample and freight into distinct lines. It also attaches a drawing revision, a declared joining route, a test record list, a sample schedule and the assumptions that were necessary because an input was missing. If a supplier has to assume anything, the assumption should be printed on the quote.

Compare the replies against a due-diligence list rather than a price column. The supplier due-diligence questions cover the evidence behind each line, and a shortlist comparison sheet is where those answers belong side by side. Three red flags are worth stopping on: no batch-level test records, no named owner of the cold plate / loop interface, and a price with no tooling or sample line.

8. Conclusion

A custom battery cold plate RFQ is not a request for a price; it is the first version of the supply agreement. Send the drawings, the heat loads, the coolant and pressure drop budget, the quality requirements and the annual volume, and ask for a quote that separates cost lines from test evidence. Suppliers who answer in that format are the ones whose samples will match their production parts.

Call to Action (CTA)

Send your drawings, duty cycle, target ΔT and annual volume to our thermal team. You will receive a quote with separated cost lines, a sample schedule and the test records we will supply with each batch - not a single unit price.

 

What should I include in a custom battery cold plate RFQ?

Send the pack layout and plate envelope, heat load at each C-rate, coolant type and inlet temperature, allowable pressure drop, mounting and sealing interface, target ΔT with sensor positions, annual volume, and the site corrosion or ingress class. Also state which requirements are fixed and which are open to proposal.

How long does a custom cold plate sample take?

It depends on the joining route, tooling and the test list, so ask for a dated sample schedule rather than a general estimate. A credible reply includes first-article approval, the validation plan and the trigger for re-qualification after a design or tooling change.

Can I get a quote without drawings?

You can get an indicative range, but not a comparable price. Without the envelope, port positions and heat loads, each bidder prices a different part. Send at least a sketch with the interface constraints, then refine the quote once the drawing revision is agreed.

 
Tell Me About Your Project
Any questions about your project can consult us, we will reply you within 12 hours, thank you!
Send a message
Leave a Message
Send a message
Guangdong Winshare Thermal Technology Co,Ltd. Founded in 2009 focused on high-power cooling solutions for the development, production and technical services, committed to becoming a new energy field thermal management leader for the mission.

Liquid Cold Plates

Heat Sink

CONTACT INFORMATION

Phone: +86-18025912990

ADDRESS

No.2 Yinsong Road,Qingxi Town,Dongguan City, Guangdong Province, China.
No.196/8 Moo 1, Nong Kham Subdistrict, Si Racha District, Chonburi Province.
Copyright © 2009-2026 Guangdong Winshare Thermal Energy Technology Co., Ltd. All rights reserved